Blown Film Machine: What the Screw Spec Tells You

2026-11-17 15:58 XIAOPAI
XIAOPAI · Wenzhou Xiaopai Electric Power Technology Co., Ltd. · Zhejiang, China

On a blown film machine spec sheet, the screw line is the shortest one. Four items, no picture, no diagram. It is also the line that decides whether the machine still makes the same film in year three.

This line runs three screws at 65, 75 and 65 mm, all 30:1, in 38CrMoAlA with a PTA coating and a nitriding treatment. Here is what each of those words is doing.

FOUR ITEMS ON ONE LINE

Steel, coating, heat treatment, length-to-diameter ratio. A buyer reads them as a block and moves on to the motor. A maintenance engineer reads them as a wear budget, because every one of the four decides how often the screw comes out.

The order matters too. Steel sets what the screw can survive. The treatment sets the surface. The ratio sets how much work the melt gets before it reaches the die. Read out of order, the line looks like a parts list; read in order, it is a specification.

WHY 38CRMOALA

38CrMoAlA is a nitriding steel: chromium and aluminium in the mix let nitrogen diffuse into the surface and form a hard case, while the core stays tough enough to take torque.

That combination is why it is the default for screws and barrels. A harder core would be brittle. A softer surface would wear at the flight edges within a year on a filled compound, and a worn flight edge shows up as a slow loss of output rather than a sudden failure. Die and screw design are usually discussed together for the same reason: both are trying to keep a melt uniform.

THE COATING AND THE NITRIDING

The nitriding gives the case. The PTA alloy coating sits on top of it and takes the abrasive load, which matters once the formulation includes calcium carbonate, titanium dioxide or a heavily filled masterbatch. Formulations change more often than screws do, and that is the whole argument for a coating.

The spec sheet makes a comparative claim here, that the coated screw lasts longer than a plain 38CrMoAlA screw. That is a wear statement, not a performance statement. It says nothing about output, and it should not be read as one.

30:1 AND WHAT IT SETTLES

The length-to-diameter ratio is the length of the melting journey in diameters. At 30:1, a 65 mm screw has roughly 1,950 mm of barrel to melt, mix and pump in.

Shorten it and the melt arrives with unmelted specks. Lengthen it and the same polymer gets more shear history than it needs, which shows up as gel or as a narrower processing window. 30:1 is the middle of the road for polyolefins, and it is where most three-layer lines sit. The consequence is visible at the die: a stable melt pressure, and a bubble that holds its gauge without the operator chasing the screw speed all shift.

The gearbox follows the same logic. This line uses 180, 200 and 180 gearboxes with carburised and ground gears, oil-lubricated, because the torque has to survive the same years the screw does.

WHEN TO PAY FOR BIMETALLIC

The barrel is offered in a bimetallic version as an option. It is worth taking when the formulation is abrasive by design: high filler loading, recycled content with grit, or a mineral-filled masterbatch that runs most of the week.

For plain LDPE and LLDPE film, the coated nitrided barrel is already doing the job. Paying for bimetallic on a clean formulation buys life you will not use, and it does nothing for gauge. The barrel is not where thickness variation comes from; the die, the air ring and the haul-off are. Operator training usually returns more per hour than metallurgy at that point.

One question settles the choice. Does the formulation carry a filler above a few percent, and does it run most weeks? If yes, take the bimetallic barrel. If the filled grade is a trial order, the coated nitrided barrel will outlast the interest in the product.

WHAT THE REST OF THE LINE SAYS ABOUT THE SCREW

The numbers around the screw line tell you what it is expected to deliver. 200 to 300 kg per hour at a 1,600 mm film width. Film from 0.001 to 0.01 mm. Thickness variation within 4 percent on LDPE at 0.15 to 0.20 mm. 110 kW installed.

A blown film machine that hits those figures on day one and again in year three is a screw that was specified, not a screw that was included. That is the difference the shortest line on the sheet is hiding. Throughput projects and line additions are planned around exactly this gap between rated and sustained output.

WHO BUILDS IT

This ABC65 line is built by a partner manufacturer and supplied by XIAOPAI, alongside a blown film machine range, a film laminating machine and a slitting line.

The screw line is worth five minutes at the quotation stage. It is worth a year of arguing after the first gauge complaint.